HRA 1 - Commencing sinking, widening or deepening of a mine shaft using entry methods at an underground mine

The mine operator of an underground mine is required to submit a commencing sinking, widening or deepening of a mine shaft using entry methods form.

HRA 2 - Installing a winding system or making major changes to an already installed winding system at an underground mine

Notifications for installing a winding system or making major changes to an already installed winding system

HRA 3 - Commissioning a winding system at an underground mine

Notifications for the commissioning of a winding system

HRA 4 - Rising using entry methods at an underground mine

Notifications for rising using entry methods

HRA 5 - Single entry development beyond 200 metres from through ventilation at an underground mine

Notifications for single entry development beyond 200m from through ventilation

HRA 6 - Construction of an underground explosive magazine at an underground mine

Notifications for the construction of an underground explosive magazine

HRA 7 - Construction of a dam or plug to store water or slurry at an underground mine

Notifications for the construction of a dam or plug to store water or slurry

HRA 8 - Construction of a fuel storage or refuelling facility at an underground mine

Notifications for the construction of a fuel storage or refuelling facility

HRA 9 - Approaching known or suspected water bodies or water-logged workings at an underground mine, including probe drilling – within 50 m

Notifications for approaching known or suspected water bodies or water-logged workings including probe drilling — within 50 m

HRA 10 - Use of a dredge at a surface mine

Notifications for the use of a dredge

HRA 11 - Construction of, or making substantial change to, a tailing storage facility at a surface mine

Notifications for the construction of, or making substantial change to, a tailing storage facility

HRA 12 - Use of explosives at a mine that is - (a) in reactive ground; or (b) in hot (>57°C) ground

Notifications for the use of explosives - (a) in reactive ground; or (b) in hot (>57°C) ground

HRA 13 - Introducing or making substantial change to externally-controlled plant at a mine that is - (a) mobile plant; or (b) production drilling plant

Notifications for introducing or making substantial change to externally-controlled plant at the mine that is - (a) mobile plant; or (b) production drilling pla

HRA 14 - Installing high voltage equipment at a mine

Mining operations are required to submit this form prior to installing high voltage equipment.